MotoGP Congress at Hotel W
Sector
Sports Sponsorship
Venue
Hôtel W
City
Barcelona


The challenge
- Hold the event in 2 different venues and on the same dates.
- Coordinate comprehensive production in the 2 spaces simultaneously: vehicles, personnel and technical equipment.

What was seen
- Comprehensive audiovisual installation with LED screens, lighting, sound and broadcast.
- More than 1000 spectators.


What went unseen
- Night assembly and disassembly, at dawn, with a technical team of more than 15 people.
- A 20m2 LED screen, integrated to the millimeter in a very limited space.


Switch’s role
Technical direction and video production